Getting down to the nitty-gritty detail work here at the Bistro! Lots of wiring done this week, as well as the installation of the beautiful cypress ceiling beams. Also the two lion heads from the old building that survived the tornado have now found their forever-home on Main Street!
[slideshow_deploy id=’1607′]